Abbeycroft Leisure and Pool Centre, Hadleigh

On 20th March 2020, Abbeycroft Leisure and Pool Centre at Hadleigh closed for a complete refurbishment of their swimming pool and facilities. Yeames' role in this extensive project was to install a PA system from the main reception area to around the pool, as well as an Incident Alarm, working alongside other trades and industries.

Overview of the Project

The extensive size of this project, both in terms of the work load and the size of the building, brought up many problems. Working alongside the clients, designers and other trades and industries, Yeames engineers were able to overcome these obstacles.

The brand new pool is to be opened early 2021

What We Have Done

1st Fix:

  • Cabling of PA systems
  • Preparation and Cabling for Incident Alarm.

2nd Fix:

  • Installation of Speakers and Microphone.
  • Installation of Incident Alarm

Comissioning:

  • Testing of PA system
  • Testing of Incident Alarm